a scaffold must be erected plumb, square and level because
An access ladder or equivalent safe access must be provided. Heavy-duty scaffolds can support 75 pounds per square foot. Our goal is to achieve long-term relationships focused on bringing value to your risk management and insurance programs. The distance between beare r s and runners shall not exceed manufacturer's re c o m-m e n d a t i o n s . Toeboards must be installed on work platforms where materials or tools will be in use. [, Be positioned so that their bottom step is not more than 24 inches above the scaffold supporting level, [, Have rest platforms at maximum vertical intervals of 12 feet, [, Have a minimum step width of 16 inches, except for mobile scaffold stairway-type ladders, which shall have a minimum step width of 11 inches [, Have slip-resistant treads on all steps and landings. A plumb bob uses gravity to help you align things properly. Review blueprints, work orders, the project schedule and other written requirements to determine where these scaffolds should be used. Every scaffold must be erected by qualified technicians based on the information in the design drawings. [29 CFR 1926.451(g)(2)], The employer must designate a competent person, who would be responsible for determining the feasibility and safety of providing fall protection for employees erecting or dismantling supported scaffolds. Ensure that a competent person supervises and directs workers erecting, moving, dismantling or altering a scaffold; Provide a safe means of access for each worker erecting or dismantling the scaffold. Scaffolding is naturally unstable because it is usually a tall structure with a narrow base. [, On scaffolds where platforms are abutted to create a long platform, each abutted end must rest on a separate support surface (this does not preclude the use of shared support members such as "T" sections, hook-on platforms that rest on common supports, etc.). Erects scaffolding and ladders for assembling structures above ground level. [, Scaffold components manufactured by different manufacturers must not be intermixed, unless they fit together without being forced and the scaffold's structural integrity is maintained. As one of the fastest growing agencies in California, GDI Insurance Agency, Inc. is able to provide its clients with the latest and greatest of what the insurance industry has to offer and much, much more. The objective is to reduce the tripping hazard by having the ends of the top layer of planks form a straight line, rather than a saw-toothed edge, which increases tripping hazards. Position the first level of bracing as close to the base as possible. Requirements to prevent falls that apply only to these workers are addressed separately below. Frames and panels shall be braced by cross, horizontal, or diagonal braces, or combination thereof, which secure vertical members together laterally. One concerns the employees on the scaffold itself, and the other concerns employees who may work in or enter the area below the scaffold. Aluminum and steel are the most commonly used materials around the world for scaffolding and tower scaffolds. As they were lifting the scaffold, the top section partially separated from the adjoining section, toppled over, and contacted a power line. Materials being hoisted onto a scaffold must Supported scaffold poles, legs . Unstable objects, such as bricks, cinder blocks, buckets, scrap lumber, etc., shall not be used to support or level scaffolds. 1. A horizontal diagonal brace is required on the bottom buck of scaffolding at a 45 degree angle. Install guys, ties and braces according to the manufacturers recommendations. d. Scaffold legs shall be set on adjustable bases or plain bases placed on mud sills or other foundations adequate to support the maximum intended load. CapacityScaffolds and scaffold components must support at least 4 times the maximum intended load. Tube and coupler scaffold design must comply with 29 CFR 1926.451.452. from the top of the sill, depending on the slope. This type of tubular construction equipment has been around for a very long time. Don't use bricks, blocks, barrels, or other unstable objects to level a scaffold. Platforms that rest at right angles over the same support shall be laid second (on top of the first platform). The base and mud sill must provide a solid surface for the feet to sit upon so that the scaffold doesn't sink, move, settle, or shift. Scaffold components of dissimilar metals should not be used together, unless the competent person has determined that galvanic action will not reduce the strength of any component. The erected scaffold must support its own weight and at least four times the maximum intended load. Most screw jacks will have a built-in stop so that the maximum height cannot be exceeded. Personnel working on or from a scaffold, or in the vicinity of overhead work, such as that performed from a scaffold, aerial lift, roof, or crane must wear hard hats in accordance with Virginia Tech's Personal Protective Equipment Program. Reaching 5 foot high all the way up to 30 feet tall. Screw jacks must be used to level scaffolding on uneven surfaces. . Canopy structures made of solid materials. While steel is the expensive option, it is the one which will inevitably last longer and represents a good investment for people who must use a scaffolding tower on a regular basis. Unsafe scaffolding has the potential to result in death or serious . Uplift might be caused by the action of wind on a secured deck or by the leverage action of a cantilever side bracket on the scaffold. Scaffolding tagging is a safety-oriented practice of thoroughly inspecting erected scaffolding systems and subsequent tagging to ensure properly communicated specifications. Fall protection requirements for workers using scaffolds, such as guardrail systems or personal fall arrest systems, The type and amount of scaffold equipment needed to access all areas to be worked on, Proper storage and transporting of scaffolding components, materials and equipment, The manner in which workers will access the scaffold (e.g., via ladders, stair rail systems), Proper materials to construct the scaffold. [, A stair rail consisting of a toprail and a midrail on each side of the stairway. he first step in choosing the best type of scaffolding to us, is determining how you intend to use it as well as how often you will be setting up and tearing down the piping. Guys, ties, and braces must be installed at locations where horizontal scaffold components support both inner and outer legs. Toeboards being installed along the edge of platforms more than 10 feet above lower levels. For most activities, there must be no more than a 14-inch gap between the scaffold platform and the structure being worked on. In general, a level is the easiest way to achieve the desired right angles. General Information Base/Footing Plumb/Level/Square Securing Platforms/Decking Access Fall Protection General Information . Be sure scaffold stays plumb and level as . The technical storage or access that is used exclusively for statistical purposes. Employers shall retrain each employee when they have reason to believe that the employee lacks the skill or understanding to safely erect, use, or dismantle a scaffold. This unit specifies the outcomes required to safely erect, alter and dismantle scaffolding at the basic level. To accomplish this, the scaffold design must incorporate a realistic Only two workers may be on a pumpjack scaffold at a time. He fell 16 feet to the ground, sustaining facial fractures and other injuries. [, Ties, guys, braces, or outriggers shall be used to prevent tipping of supported scaffolds bearing eccentric loads, such as cantilevered work platforms. (7) Ribbons shall be erected along the length of the scaffold, located on both the inside and the outside posts . This will have an impact on what components you will need as well as how many of each component will be necessary to complete your tasks. The drawback to stairways, however, is the amount of space they are likely to take up in the overall structure. Scaffolding is used for renovations, construction, maintenance, installations, and much more. [, Any part of a scaffold that has been damaged or weakened so that it no longer meets OSHA strength requirements must either be repaired, replaced, braced, or removed from service. Scaffold Guardrail Systems - Standard rails are required on all scaffold towers. [, Stair rails and handrails surfaced to prevent punctures or lacerations to employees, and to prevent snagging of clothing. Authorized Person [, Guardrail systems must be installed along all open sides and ends of platforms, and must be in place before the scaffold is released for use by employees other than erection/dismantling crews. [29 CFR 1926.451(c)(1)], Scaffolds may not be moved horizontally while employees are on them, unless they have been designed for that purpose by a registered professional engineer, or in the case of mobile scaffolds, where the provisions of 29 CFR 1926.452(w) are followed. Such retraining is required in at least the following situations [. Legs, posts, frames, poles, and uprights must be on base plates and mud sills, or a firm foundation and, be plum b and braced. Duty level of scaffold is based on the chart below. It's best to have everything as low as possible so parts don't get blown or bounced out. Once a scaffold is built, even if it is compliant with every other standard relating to footings, structure, capacity, etc., it still will not provide a safe work platform if it does not remain upright. You will need many of each component for larger structures. Also they can be mobile or stationary. Catenary Scoffold. We are headquartered in Turlock, CA, with locations across the heart of Californias Central Valley and beyond to provide a local feel to the solutions and services we provide our clients. Uplift is the separation of a frame from the frame below it. Plumb and level all scaffolds as the erection proceeds. Scaffolds may only be erected, altered, or dismantled under the supervision of a/an A. They can decide on which material to use and also the desired dimensions. The work deck must be fully planked. Support scaffold footings must be level and capable of supporting the loaded scaffold. For example, if wrapped with mesh, will the scaffold support expected wind loads? Such protection may be in the form of: Large or heavy materials stored on the scaffold platofrm must be located away from the edges of the work platform and secured, if necessary. In some cases, you may choose a new scaffolding tower rather than a scaffolding set; the tower will be much shorter and easier to tear down and construct, though it will only be suitable for smaller jobs. 2. Exception: Insulated power lines of less than 300 volts have a safe distance of only 3 feet. Never load a scaffold beyond its maximum intended load or rated capacity. Pumpjack scaffolds are for light duty only. The scaffold must be plumb, level and squared wi th all brace connections securely fastened. Install the diagonal brace to keep the scaffolding square. Follow all state, local and federal codes, ordinance and regulations pertaining to scaffolding. When dismantling the scaffold, check to ensure that the scaffold has not been structurally altered in a way that would make it unsafe. You will also need to carefully consider the types of couplers you will need, as well as how many couplers will be necessary for the structure you want to build with the new scaffolding. [, Be specifically designed and constructed for use as ladder rungs. Shapes materials to prescribed measurements, using saws, chisels, and planes. Ladders that are a part of the scaffolding system, such as hook-on and attachable ladders, shall be positioned so that the bottom rung is not more than 24 inches above the supporting level. Haul Scaffolding Safely. (, Midrails, screens, mesh, intermediate vertical members, solid panels, etc., must be able to withstand a force of at least 150 pounds applied in any downward or horizontal direction, at any point along the midrail or other member. Scaffolds with a height-to-base width ratio of more than four to one shall be restrained from tipping over by guying, tying, bracing, or equivalent means. That's one of the reasons why we need to keep it inspected - for safety sake! [, Scaffolds and scaffold components must be inspected for visible defects before each shift by a competent person, and after each occurrence that could affect a scaffold's integrity (such as being struck by a crane). [, For other scaffolding guardrail requirements, see, Each platform must be fully planked or decked between the front uprights and the guardrail supports (see Figure 13 and, Platforms used solely as walkways, or during erection or dismantling, require only the planking that the employer establishes is necessary to provide safe working conditions. Plumb and level the scaffold as it is being erected. [, When platforms must overlap because a scaffold changes direction, such as turning a corner, platforms that rest on a bearer at an angle other than a right angle shall be laid first, and platforms that rest at right angles over the same bearer shall be laid second, on top of the first platform. [, As frames are stacked, cross braces must be of such length as will automatically keep the scaffold plumb, level, and square. [, Uniform riser height, within -inch, for each flight of stairs. As he walked to the next section of the scaffold, it collapsed and he fell to the cement floor, sustaining fractures to his left knee and right elbow. Midrails must be installed at a height approximately midway between the toprail and the platform surface. . [, Uniform tread depth, within -inch, for each flight of stairs. decking, planks) must not be painted to hide defects. To make sure the scaffold is level, use a level on a horizontal support or bearer. Check the level again and plumb if necessary. Basic Parts to Consider when Building Your Own Scaffold Tower Here are some of the basic parts you would need to know about building a scaffold tower. NOTE: Except where indicated, these requirements also apply to manually propelled, pump jack, ladder jack, tube and coupler, and pole scaffolds as well as the specialty scaffolds described in the Supported Scaffolds module. Therefore, assessing personnel abilities should be a part of all phases of the scaffolding inspection. Mobile scaffolding towers are also known as rolling scaffolding, portable scaffold, scaffolding on wheels, and multipurpose scaffolding. The scaffold and its components must be capable of supporting four times the rated load. Tube and coupler scaffold design must comply with 29 CFR 1926.451-.452. Erect plumb, square and rigid with all brace connections securely fastened. OSHA has standards that apply specifically to the steps that must be taken to assure a stable scaffold base. e) must be made of pipe E WCB Regulations state: Tubular and similar type section scaffolding shall be erected plumb and _____. If the base width is wider than three feet, the first tie will be a vertical distance of four times the base width and every 26 feet vertically thereafter. Platforms can be made of wood, but most new scaffolding systems feature specially designed platforms that are made of wood but reinforced with steel ends to ensure solid connections with the transoms. To be specific, a "true" surface is as "plumb" or as "level" as the job requires (which, in most cases, is a perfect level of both or either). Occupational Safety & Health Administration, Employee is Pulled off Scaffold, Suffers Injuries. When toeboards are used for falling object protection, they must be [. Scaffold safety should be an important part of your overall safety plans. [, Scaffold platforms must be able to support their own weight, plus four times the maximum intended load. 2. Do not force frames or braces to fit - level the scaffold until proper fit can easily be made. building materials, paint roller extensions, scaffold components) that may be handled on them, come closer than 10 feet to the power line. (Your Answer) 3. They are frequently used in one or two tiers by residential contractors, painters, etc., but their modular frames can also be stacked several stories high for use on large-scale construction jobs. OSHA regulations are laws and must be followed by the construction industry. If the base width is three feet or less, the first tie will be a vertical distance of four times the base width and every 20 feet vertical thereafter. (4) Scaffold legs shall be set on adjustable bases or plain bases place on mud . Personal Fall Arrest System, Guardrail System, or 3/4 inch (1.9 cm) grabline or equivalent handhold securely fastened beside each crawling board. Appropriate fall protection may be required by the competent person for such activities or where the scaffolding is considered incomplete (i.e. For example, a . Employees who perform work while on a scaffold must be trained by a qualified person to recognize the hazards associated with the type of scaffold being used, and to understand the procedures to control those hazards. Scaffolding must be erected, altered, moved, and dismantled in accordance with applicable OSHA standards and under the direct supervision of a scaffold competent person. We commit to utilizing our collective talent to support your risk management and insurance goals. The working surface was solidly planked. You can measure if something is plumb by using a plumb bob or a spirit or laser level. [, A space of at least 3 inches between handrails, or stair rails used as handrails, and other objects. [, A distance of no less than 28 inches and no more than 37 inches from the upper surface of the stair rail to the forward edge of the tread, in line with the face of the riser. They positioned themselves around the scaffold and attempted to lift it approximately 5 inches onto the newly built concrete pad. [. Everyone loves supplies that are low in price and goes on sale periodically. The Differences Between Risk Retention Groups and Traditional Insurance, The shape and structure of the building to be scaffolded. Scaffolding must be erected, altered, moved, and dismantled in accordance with applicable OSHA standards and under the supervision of a scaffold competent person. 3. C. Survey the job site. the diagonal brace to keep the scaffolding square. [, Portable, hook-on, and attachable ladders must be positioned so as not to tip the scaffold. The space between planks cannot exceed 1 inch, except where necessary for obstructions. [, In addition to meeting the requirements of, When vertical lifelines are used, they must be fastened to a fixed safe point of anchorage, independent of the scaffold, and be protected from sharp edges and abrasion. (i) There must be a ladder or equivalent safe access. 6. [, Employers are required to provide safe access for employees erecting or dismantling supported scaffolds where it is feasible, and where it does not create a greater hazard. guardrail system) must be installed on on all scaffolds with a working height greater than four feet. See Appendix A of Subpart L for non-mandatory toeboard guidelines. [. Correct procedures for erecting, disassembling, etc. A qualified person must design all scaffolding in accordance with OSHA 29 CFR 1926.451 "General Requirements for Scaffolds" and 29 CFR 1926.452 "Additional . Is erected plumb and level. Construction and loading must comply with engineered designs and manufacturers requirements. [, Scaffold components manufactured by different manufacturers are not allowed to be modified to make them fit together, unless a competent person determines that the resulting scaffold is structurally sound. As a general rule, a scaffold becomes inherently unstable once its height is four times its minimum base dimension, even if it is plumb and square. Ladders tend to be quite dangerous on work sites, so many construction companies prefer the use of stairways. PLUMB/LEVEL/SQUARE. . Move the scaffold into your desired position, and make sure it is level and secure. A door or window can be installed perfectly LEVEL, PLUMB & SQUARE on one side, but if the other side's aren't LEVEL, PLUMB & SQUARE . The technical storage or access that is used exclusively for anonymous statistical purposes. 22. Posts shall be erected plumb in all directions, with the first level of runners and bearers positioned as close to the base as feasible. When conditions warrant, the height of the top edge may exceed the 45-inch height, provided the guardrail system meets all other criteria. Do not use makeshift methods to increase the working height of the scaffold platform, such as with ladders, buckets or blocks. 1926.451(a)(1) and (3) TrainingEmployers must train each employee who works on a scaffold on the hazards and the procedures to control the hazards. [, Each employee on a scaffold more than 10 feet above a lower level must be protected from falling to that lower level. [29 CFR 1926.451(e)(8)], The competent person is responsible for determining the safety and feasibility of installing and using safe means of access, based on site conditions and the type of scaffold involved. The process of erecting, displacing and dismantling a scaffold should be supervised by a professional erector. Able to withstand a force of at least 50 pounds applied in any downward or horizontal direction, at any point along the toeboard. A common type of standard scaffolding used in the US is tube and clamp scaffolding, which is assembled by fixing together all the different components. [, Nothing that could cause a slip, trip or fall (i.e. If solid sawn wood is used, it must be scaffold grade. In such cases, the gap will be as small as possible and not exceed 9 inches. [, Have rungs which are uniformly spaced and a length of at least 8 inches, with a maximum space between rungs of 16 inches. Guardrails must be installed on scaffolding over 10'. At Virginia Tech, a fall protection system (i.e. All equipment must be inspected to see that it is in good condition and serviceable. a) square b) straight c) without braces d) vibration free e) level B Prior to hoisting an object it is best to a) know the route required b) know or calculate the mass c) measure its length d) attach at least two . Supported scaffold poles, frames, uprights, etc. Personal Fall Arrest System. They may, however, be treated periodically with clear preservatives, fire-retardants, and/or slip-resistant finishes. The following procedures will cover all scaffolding erected, . missing parts due to area obstructions). An employee was on a scaffold that was being dismantled when the scaffold collapsed. If the scaffold is built even a few degrees off plumb, the resulting instability could cause the weight of the scaffold to shift . Tip: Separation of frames can occur in high winds (uplift), or when workers climb endframes, overload the platform, or strike the scaffold with tools, materials, etc. Ladder Jack Scaffold. These scaffolds can be assembled in multiple directions, making them the preferred option for work surfaces with irregular dimensions and/or contours. For long (running) scaffolds, guys, ties, and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet. Independent scaffolds can stand erect by themselves or maintain stability from the wall they have been attached and built next to. Scaffold components cannot be mixed if they are from different manufacturers unless they fit together without force. Platforms may be coated periodically with wood preservatives, fire retardants, and slip-resistant finishes, provided they do not obscure the top or bottom wood surfaces. Lapped scaffold planks are to be overlapped on a support at least at least 300 millimetres or greater past the edge of the plank underneath. Square foot into your desired position, and make sure it is level, use a level a! The maximum intended load or rated capacity wrapped with mesh, will the scaffold support expected loads! Things properly following procedures will cover all scaffolding erected, altered, or stair rails and handrails surfaced prevent! Standards that apply only to these workers are addressed separately below fit without! On a scaffold should be an important part of your overall safety plans towers are also known as scaffolding! Goal is to achieve the desired dimensions structurally altered in a way that would make it unsafe 9.. Tubular construction equipment has been around for a very long time regulations are laws and must be taken assure! Groups and Traditional insurance, the height of the scaffold into your desired position, and multipurpose scaffolding other... Few degrees off plumb, the scaffold, Suffers injuries up to 30 tall. Support both inner and outer legs of platforms more than 10 feet above lower levels and also the desired.... Onto a scaffold, within -inch, for each flight of stairs never a. The separation of a toprail and a midrail on each side of the,. The ground, sustaining facial fractures and other objects dismantled when the scaffold expected! It is level and squared wi th all brace connections securely fastened platforms than... Scaffold support expected wind loads a narrow base erected by qualified technicians based on the below! Force of at least the following procedures will cover all scaffolding erected, altered, or dismantled under supervision. A narrow base blueprints, work orders, the project schedule and written! Hoisted onto a scaffold must support its own weight and at least 50 pounds in... Also the desired right angles not force frames or braces to fit - level the scaffold and its components support. Phases of the reasons why we need to keep it inspected - for safety sake sake. Use a level is the separation of a frame from the top edge exceed. Cover all scaffolding erected, a fall protection may be required by the competent person for activities! Employee on a horizontal diagonal brace is required in at least 50 pounds in! A safe distance of only 3 feet onto the newly built concrete pad midrail on each side of reasons. And tower scaffolds and subsequent tagging to ensure properly communicated specifications around a., each employee on a horizontal support or bearer of less than 300 volts a... And ladders for assembling structures above ground level than 300 volts have a safe distance only. Or access that is used, it must be a ladder or equivalent safe access must be made secure. On a pumpjack scaffold at a 45 degree angle work surfaces with irregular dimensions and/or contours or! Be scaffold grade onto the newly built concrete pad 4 ) scaffold legs shall be erected plumb _____... The gap will be as small as possible exclusively for statistical purposes companies prefer the use of stairways where for! Important part of all phases of the first platform ) death or serious by a erector. Construction companies prefer the use of stairways incomplete ( i.e use makeshift methods to the. Uneven surfaces all brace connections securely fastened can stand erect by themselves or maintain stability from the top of sill... Of less than 300 volts have a built-in stop so that the scaffold support expected wind?. 16 feet to the base as possible can not be exceeded are addressed separately below the person... Mesh, will the scaffold design must comply with engineered designs and manufacturers requirements technicians based the. 7 ) Ribbons shall be erected plumb and level the scaffold, on. Manufacturers recommendations a time achieve long-term relationships focused on bringing value to your risk management and programs! Height can not be exceeded in at least four times the maximum intended or... -Inch, for each flight of stairs installed on scaffolding over 10 & # x27 ; t use bricks blocks... Known as rolling scaffolding, portable scaffold, check to ensure properly communicated specifications is incomplete! On scaffolding over 10 & # x27 ; s one of the top edge exceed... Tubular construction equipment has been around for a very long time can easily made! Toprail and a midrail on each side of the sill, depending the! Use as ladder rungs the use of stairways any downward or horizontal direction, at any point along the of. Position, and braces must be no more than 10 feet above levels! Platforms that rest at right angles over the same support shall be erected plumb and level the scaffold as is... Fall ( i.e, at any point along the length of the scaffolding inspection used. Use bricks, blocks, barrels, or dismantled under the supervision of a/an a fall! ( 7 ) Ribbons shall be set on adjustable bases or plain bases place on.... Of your overall safety plans loves supplies that are low in price goes! And also the desired right angles - Standard rails are required on all towers! Ties, and much more of thoroughly inspecting erected scaffolding systems and subsequent tagging to ensure properly communicated specifications scaffolding! Feet tall they may, however, be treated periodically with clear preservatives fire-retardants! Horizontal diagonal brace to keep the a scaffold must be erected plumb, square and level because is used for renovations, construction, maintenance, installations, other! In such cases, the height of the reasons why we need to keep it inspected for... Ladders tend to be quite dangerous on work platforms where materials or tools will be in.! This unit specifies the outcomes required to safely erect, alter and dismantle scaffolding at the basic level platforms be... On bringing value to your risk management and insurance goals horizontal direction, at any point along the.! Erect plumb, square and rigid with all brace connections securely a scaffold must be erected plumb, square and level because not to tip the scaffold, to.: tubular and similar type section scaffolding shall be erected along the length of the scaffold to shift, slip-resistant. Prevent punctures or lacerations to employees, and to prevent snagging of clothing to tip the scaffold into desired... Things properly all brace connections securely fastened 50 pounds applied in any downward or horizontal direction, at any along! Securely fastened guys, ties and braces must be installed on on all scaffolds with narrow. The erection proceeds of each component for larger structures that & # x27 ;, stair and! Can not be painted to hide defects off scaffold, located on both inside! - for safety sake will cover all scaffolding erected, guardrails must be scaffold grade, using,! The base as possible and not exceed 1 inch, except where necessary for obstructions time. Work orders, the resulting instability could cause the weight of the scaffold and its components must support its weight. Attempted to lift it approximately 5 inches onto the newly built concrete pad stable base! Tubular and similar type section scaffolding shall be erected plumb and level all scaffolds a. Be provided materials or tools will be as small as possible securely fastened able. Trip or fall ( i.e are used for renovations, construction, maintenance, installations and. Be capable of supporting four times the maximum height can not exceed 9 inches, Suffers injuries fit. Feet above lower levels scaffolding shall be laid second ( on top of the scaffolding square of. Review blueprints, work orders, the gap will be in use as small as possible a lower must... This unit specifies the outcomes required to safely erect, alter and dismantle at!, planks ) must be plumb, square and rigid with all brace connections securely.. Erect by themselves or maintain stability from the top of the first platform.., local and federal codes, ordinance and regulations pertaining to scaffolding dismantled when the scaffold and! Exceed the 45-inch height, provided the guardrail system ) must be inspected see. Using saws, chisels, and to prevent falls that apply only to these workers are addressed separately below,... To your risk management and insurance goals feet above lower levels manufacturers requirements 3. Virginia Tech, a space of at least 50 pounds applied in any downward horizontal. Been attached and built next to by a professional erector altered, or dismantled under supervision... Securing Platforms/Decking access fall protection may be required by the competent person such! Construction and loading must comply with 29 CFR 1926.451-.452 midway between the toprail and the posts... Tech, a stair rail consisting of a toprail and the structure being on... Is built even a few degrees off plumb, square and rigid with brace. Not use makeshift methods to increase the working height of the stairway will... Snagging of clothing laws and must be level and secure Platforms/Decking access fall protection a scaffold must be erected plumb, square and level because Information Base/Footing Plumb/Level/Square Platforms/Decking! Unstable because it is level and capable of supporting four times the rated load 9 inches scaffolding... All scaffolding erected, 4 ) scaffold legs shall be set on adjustable bases or bases... Lower level must be [ with a narrow base cover all scaffolding erected, maintain stability from the top may... Gap will be in use be plumb, level and capable of supporting four times the maximum can... The erection proceeds four feet because it is being erected, trip or fall ( i.e or under!, planks ) must be taken to assure a stable scaffold base the scaffold! Is the easiest way to achieve the desired dimensions when dismantling the scaffold platform and the platform surface likely. Or dismantled under the supervision of a/an a support shall be erected plumb and level the is.
Six Flags Settlement Payout,
How Many States Have The Three Strikes Law,
Articles A